Case Study
Lake Revive Bhandwari
50M
Liters water saved
4
Bio-remediation zones
600
Volunteers trained
Challenge Overview
Untreated sewage, invasive weeds, and illegal dumping had turned the lake into a hazardous zone affecting 5,000 households.
Execution Strategy
We combined desilting, constructed wetlands, reed-bed planting, and floating wetlands with continuous STP quality monitoring.
- Water-flow mapping to balance inflow and outflow
- Community stewardship committees formed
- Regular water checks shared openly with the community
Impact Results
35%
Drop in local heat index
18 species
Birds returned
8 tons
Waste diverted monthly